Berkeley Jet Pump Rebuilds
"Start Original, Stay Original" - Making the best better again!
Each pump is disassembled, cleaned and inspected. The shaft
is checked for straightness. The pump is then assembled using all
new parts including your choice of aluminum impeller size, bearings
(pre greased), impeller nut, seals, packing, bearing snap ring, impeller
key-way and a complete gasket set. Jet pumps are brought back to
stock specifications and have a one year warranty on parts and labor. Only genuine Berkeley parts are used. No inferior import pieces. Click on the part number to
check pricing or place an order.
Berkeley
Factory Jet Pump Rebuilds
Call about special shipping! |
|
Description of Blueprinting Labor
| Part
No. |
Description |
|
150-2001
|
Stage 1 - Disassemble, clean, inspect all parts:
- R&R parts (wear ring, bearings, bushings, seals).
- Machine parts as necessary for proper fit and
clearance (bearing cap. shaft, impeller).
- Modify inlet side of impeller for less cavitation
and more flow.
- Lube and precision assemble.
|
|
150-2003
|
Stage 2 - All the above, plus:
- Add stuffer to bowl to improve water flow off
impeller into bowl
|
|
150-2004
|
Stage 3 - All the above, plus:
- Modify bowl inlet vanes for smooth flow.
- Modify bowl outlet vanes for less turbulence
and straighter exit flow.
|
|
150-2005
|
Stage 4 - All the above, plus:
- Double bolt suction piece, bowl, and bearing cap.
|
|
150-2006
|
Option A
- Ride plate modification with shoe, polished
plate and cradle assembly, stainless
steel fastener kit.
|
|
|